Skip to main content

Warehouse Order Picker Platforms (OP Cages) - Quick Change Shelves - Heavy Duty Aluminum

New Age Industrial Quick Change Order Picker Platforms: Revolutionize Your Warehouse Efficiency & Elevate Your Warehouse Operations

Experience the future of warehouse efficiency with our innovative Quick Change Order Picker Platforms. These versatile platforms are the perfect solution for warehouses, distribution centers, and large-scale operations. Order Picker Platforms are accessories for man-up order pickers that assist in safe, efficient picking & fulfillment in vertical environments. The fork pocket features a replaceable, solid oak block that the gripper on the order picker machine locks onto. That lock provides a connection between the order picker and platform. It raises the platform with the operator and picked goods are placed on it.

Key Features and Benefits:

Quick and Easy Shelf Re-Configuration: Easily customize your platform with our quick-change shelving system, allowing for effortless removal or adjustments to accommodate various product sizes and quantities.

  • Lift-Off Shelves
  • Shelves Pitched 4° to the Back
  • Shelf Runners on 14" Centers
  • Optional Removable 15" & 30" D Shelves

Enhanced Safety: Our platforms are built with safety in mind, featuring matched order picker deck height, anti-slip grip tape, anti-tip brackets, and ergonomic design to minimize the risk of accidents. Matched deck eliminates a trip hazard when operator transitions between OP machine and platform.

  • Smooth amplimesh sides and backward sloping shelves aid in product containment.

Superior Durability: Constructed from high-quality aluminum, our platforms are lightweight yet incredibly strong, ensuring long-lasting performance. Our Aluminum OP Cages are nearly 1/3 the weight of their steel counterparts.

Efficient Operations: Streamline your workflow with our versatile design, allowing for easy maneuvering and optimal storage utilization.

  • Operator Push Handle on Back for Manual Maneuvering
  • Equipped with four 6” x 2” heavy duty plate type casters, two rigid (#C518) and two swivel with brake (#C511).
  • Weighs Less Than 300 lbs

Customizable Solutions: Tailor your platform to your specific needs with our wide range of customization options, including size, accessories, and lift type compatibility.

Optional Additional Features:

  • 99664S15 Optional 15” Deep Quick Change Shelf
  • 99664S30 Optional 30” Deep Quick Change Shelf
  • Crown, Clark, Hyster, Raymond, and Toyota lift equipment
  • Custom Lift Types Available
  • Tow Hitches to enable seamless integration into train systems
  • Ware Strips to increase longevity of oak gripper block

Why Choose New Age Order Picker Platforms?

Increased Productivity: Boost your picking efficiency and reduce labor costs with our time-saving design.

Improved Safety: Prioritize the well-being of your employees with our safety-focused features.

Enhanced Flexibility: Adapt to changing inventory needs with our customizable solutions.

Reduced Downtime: Minimize downtime with our durable construction and easy maintenance.

Ready to Transform Your Warehouse?

Our customizable warehouse equipment, including order picker platforms, provide tailored solutions for your specific needs. Contact us to learn more about our Quick Change Order Picker Platforms and discover how they can revolutionize your operation.

Need Something Unique? Start Customizing Your Platform Today! Contact Us for a Free Quote.

Available Models

6 models
Model # UPC Image Spec Sheet Subtype Description Length (in.) Width (in.) Height (in.) Deck Height Deck Size Shelf Size Shelves Wt. Capacity (lbs) Caster Type Caster Size Net Wt. (lbs) Ship Wt. (lbs) Price Lead Time
99664C
715347310643 PDF 2, 30" deep shelves Crown/Clark Lift Type 52 40 77 5.375" 46.75"W x 37.5"L Top: 29.5”W x 36.75”L Middle: 29.5”W x 36.75”L Base Deck: 37.5"W x 46.75"L 3 250 lbs Per Shelf 2,000 lbs Total Plate Type (Platform) 6" x 2" 293 335 $Contact Factory 40 Days C
99664H
715347318366 PDF 2, 30" deep shelves Hyster Lift Type 52 40 78 6.125" 46.75"W x 37.5"L Top: 29.5”W x 36.75”L Middle: 29.5”W x 36.75”L Base Deck: 37.5"W x 46.75"L 3 250 lbs Per Shelf 2,000 lbs Total Plate Type (Platform) 6" x 2" 328 335 $Contact Factory 40 Days C
99664R
715347221017 PDF 2, 30" deep shelves Raymond Lift Type 52 40 76 4.375" 46.75"W x 37.5"L Top: 29.5”W x 36.75”L Middle: 29.5”W x 36.75”L Base Deck: 37.5"W x 46.75"L 3 250 lbs Per Shelf 2,000 lbs Total Plate Type (Platform) 6" x 2" 293 335 $Contact Factory 40 Days C
99664S15
715347221024 PDF Additional Shelf N/A 36.75 15.375 1.5 — — 15.375”W x 36.75”L 1 250 lbs — — 11.4 15 $518 40 Days C
99664S30
715347300255 PDF Additional Shelf N/A 36.75 30 1.5 — — 29.5”W x 36.75”L 1 250 lbs — — 21 24 $679 40 Days C
99664T
715347319080 PDF 2, 30" deep shelves Toyota Lift Type 52 40 76 4.375" 46.75"W x 37.5"L 29.5”W x 36.75”L 3 250 lbs Per Shelf 2,000 lbs Total Plate Type (Platform) 6" x 2" 293 335 $Contact Factory 40 Days C